CARRINGTON ST & BROADWAY

PROJECT OVERVIEW
City of Nedlands entrusted WCP Civil to upgrade the existing Carrington St roundabout as well as upgrade the CoN owned southbound lane of Broadway between Stirling Hwy and Princess Rd. Both roads have significant traffic numbers and stakeholders and the Carrington St portion is right in front of the City of Nedlands Works Depot.
SCOPE OF WORK
- Prepare and implement throughout construction all required management plans including site, dust, noise and vibration, traffic, quality, emergency and safety management.
- Clearing trees and preparatory reticulation works
- Demolition of existing kerb, signs/rails, pavement, driveways/paths
- Strip topsoil and earthworks to establish design subgrade levels
- New subbase and basecourse preparation
- New drainage structures including soakwells, RCP and connection to existing stormwater drainage
- Kerbing, brick paving, concrete ramps and paths
- Three different asphalt mixes as well as primerseal
- Temporary linemarking and signage works plus spotting for MRWA work
- Traffic control for duration of works